15ml centrifuge tubes factory

2019年10月10日(木) The bolt had exhausted the power and strengths

The identified platform led to the classification as the yellow Pipette Tip suppliers failure. The lab section of the connection was the bus and the rail linking the sensor mechanism to the line connecting the rail, the processing bus, and the Radio Frequency Identification Technology. The rail linking the production technology became loose increasing noise and the standstill of the rail movement.



The reinforcement of the three supporting elements led to the miss alignment of the connected plates that were between the connection links. The potential of the bolt to sustain the pressure of the system could reveal the direct impact of the threads having the cracks. The failure analysis and prevention process enforce on testing and verifying that the analyzed devices conform to the standards and the policies set to support the industrial functions.



The bolts were applied to support the production and the bus technology system involved in the process of manufacturing. The supplier had to manufacture a new brand of the bolt since the bolt never existed within the stock. The various samples of the corrected information had data and information giving the results that suggested that the bolt was under bending forces.The Effects of Bolt Failure and ConsequencesThe report involves the analysis of the bolt that led to an industrial fault. The bolt indicated persisted strenuous period that persisted for the long period. When the bolt has faulted the chances of causing catastrophic disaster has high probability. The IT oriented professional had needed for the purpose of supporting the artificial intelligence. The bolt had exhausted the power and strengths to keep holding the joint continuously. The bolt experienced some traits that indicated the features of the bolt requiring replacements from a long time.



According to the results the broken bolt had revealed traits of encountering fatigue. The extension of the constrictions that indicated the presentence of high fatigue had the clear view on the broken surfaces. The normal running of the production had influence for two weeks. The plates provided the stability of the production system. The production target dropped from 1000 units to 500 units. The presence of the cracks on the threads had a clear picture that the bolt was highly undergoing the process of fatigue.



 < 過去  INDEX  未来 >


pcrtubes